Smart Energy Management System Construction Scheme [Energy Internet of Things Smart Microgrid Digital Campus, Energy Saving and Low Carbon]]

Release time:2024-05-10


Implement the requirements of the "Opinions of the Central Committee of the Communist Party of China and the State Council on the Complete, Accurate and Comprehensive Implementation of the New Development Concept and the" Notice of the State Council on Printing and Distributing the Carbon Peak Action Plan by 2030 ", and incorporate green and low-carbon development into the national education system.

Implement the requirements of the "Opinions of the Central Committee of the Communist Party of China and the State Council on the Complete, Accurate and Comprehensive Implementation of the New Development Concept and the" Notice of the State Council on Printing and Distributing the Carbon Peak Action Plan by 2030 ", and incorporate green and low-carbon development into the national education system.On March 26, 2021, in order to promote the deep integration of information technology and education and teaching, the Ministry of Education issued the "Standards for the Construction of Digital Campus in Colleges and Universities (Trial)"

Traditional mode problem

Project mode:

Project subcontracting, independent and not interlinked.

Although the energy use on campus is a whole, the monitoring of energy use is indeed scattered.

Management needs:

Power monitoring (power transformation and distribution safety) and energy consumption monitoring (statistics of campus energy consumption uploaded to superior departments) fire fighting (standard requirements) are necessary systems and have no management requirements.

Dormitory electricity management design Dormitory electricity safety and charges, is the necessary management needs of each university.

Charging pile (new energy) is the trend.

  

Traditional mode pain points

The system scheme under the traditional project mode lacks the overall energy monitoring and control requirements. The school wants to realize the comprehensive energy management and needs to coordinate the direct communication and data integration or re-project reconstruction of different manufacturers. The cost is large and the cycle is long, which is not conducive to the construction of low-carbon campus.

 